Instruction How to Use:
1、Simply put electrode, separator, and electrolyte materials into the split cell with no screws required.
2、Place the split cell into a mechanical jig fixture to apply pressure without crimping and seal the O-rings. Please select from the Product Options
3、Connect current leads to a battery analyzer for testing the assembled pouch cell
4、You may choose a hydraulic press or a digital press to apply pressure by clicking pics below
Max. Working Pressure:20 MPa for Peek materials, 10 MPa for Nylon materials
Dimensions:80L x 66W x 29H (mm) cell interior: 58L x 45W x 4H (mm)
Click one of our contacts below to chat on WhatsApp